Can you start from a 3D model alone?
Yes, a model can start the review. Add a drawing or explicit callouts for fits, threads, geometric controls, surface texture and acceptance details that the model does not define. Resolve missing requirements before production release.
Can I send metric or inch drawings?
Yes. Identify the intended units and keep the model, drawing and notes consistent. Any conversion, rounding or conflicting dimensions must be clarified during review.
Can you assess one prototype or a small first order?
Yes. Share the initial quantity and likely repeat demand. Stock purchasing, holding, tooling, treatment batches and inspection determine the feasible order scope and quotation.
Is there a fixed minimum order quantity?
The practical order quantity is reviewed with the part, material and manufacturing scope. Give the trial lot and repeat release quantities separately so the quotation reflects what you intend to purchase.
Can I request material certificates?
Yes. Specify the certificate type, material specification and required heat or lot traceability. Document availability and linkage to the supplied stock must be confirmed for the selected order.
Can you use customer-supplied stock?
Raise this at inquiry. Agree stock dimensions, condition, identification, documents and incoming acceptance, together with responsibility for unsuitable material, before it becomes an approved production input.
What part sizes and tolerances can you accept?
Send the complete geometry and feature-specific requirements. Feasibility depends on material, length and diameter, support, tool access, process sequence and measurement. The project review establishes the accepted scope.
Can you supply the part after heat treatment and finishing?
Include the required material condition, hardness, surface treatment and final dimensional requirements in the RFQ. The quotation confirms the compatible sequence, protected areas and final acceptance stage.
Can flats or cross-holes be included with the turned part?
Yes, include all features and their datum requirements in the drawing for route assessment. We confirm the secondary operations and the complete finished-component scope during project review.
How do you handle a legacy concentricity callout?
Provide the governing drawing standard and edition. We clarify the intended geometric control and evaluation before release; any revision to the requirement is agreed with your engineering team.
Can you review an urgent delivery date?
Yes. Send the required receiving date and destination with the drawing and quantity. Material, approval, preparation, treatments, inspection and transport must be checked before the schedule is confirmed.
Can you arrange international delivery?
EXW, FOB or DDP can be scoped by project. Share the destination and receiving requirements so packing, freight, duties and import responsibilities are explicit in the quotation.